Login

Videos

Videos

Commissioning JLA-e facelift

The video demonstrates the necessary steps to commission the electric powered trolley JLA-e 5/12 G facelift.

 


Installation

The video shows the steps necessary to put the electric powered trolley JLA-e 5/12 G trolley into operation.


Troubleshooting JLA-e

The video shows the steps necessary to remedy malfunctions on the electric powered trolleys JLA-e.

+49 7151 303930
info@jung-hebetechnik.de